{"id":353,"date":"2018-06-08T21:20:11","date_gmt":"2018-06-08T19:20:11","guid":{"rendered":"https:\/\/lesmonstresdecigeo.noblogs.org\/?page_id=353"},"modified":"2018-06-10T20:59:13","modified_gmt":"2018-06-10T18:59:13","slug":"ingerop-et-cigeo","status":"publish","type":"page","link":"https:\/\/lesmonstresdecigeo.noblogs.org\/en-US\/ingerop-et-cigeo\/","title":{"rendered":"INGEROP and CIGEO"},"content":{"rendered":"<h3>But what is INGEROP doing on the CIGEO project?<\/h3>\n<p>In the beginning of 2012, Ing\u00e9rop becomes part of the Gaiya grouping which aims to carry out <em>system project management<\/em> for Cig\u00e9o, project of a disposal center for nuclear waste directed by Andra (National agency of radiactive waste).<\/p>\n<p>Ing\u00e9rop plays a critical role in the preliminary phases of the Cig\u00e9o project, by making the link between the different companies which carry out the project management. It&#8217;s one of their main projects of which they praise a lot the innovative aspect. They are also very proud of working in the nuclear sector.<\/p>\n<p>The main contracts which links Ing\u00e9rop to the Cig\u00e9o project, of 70 millions of euros, currently runs from 2012 and 2018, and should probably continue afterwards for the rest of the project. Concerning related projects, preliminary to Cig\u00e9o, Ing\u00e9rop notably handles project management for the electrical transformer which construction is planned next to the futur nuclear waste burrying center.<\/p>\n<div id=\"extraits_de_la_fiche_technique_ding\u00e9rop_concernant_wiki_280641\" class=\"extraits_de_la_fiche_technique_ding\u00e9rop_concernant_wiki\">\n<h3 class=\" shy_parent\">Translated extracts of <a href=\"http:\/\/www.ingerop.fr\/sites\/default\/files\/pdf_des_projets\/projet-cigeoenergie.pdf\">the technical file of Ing\u00e9rop concerning CIGEO (french)<\/a><\/h3>\n<\/div>\n<blockquote>\n<div id=\"extraits_de_la_fiche_technique_ding\u00e9rop_concernant_wiki_280641\" class=\"extraits_de_la_fiche_technique_ding\u00e9rop_concernant_wiki\">TECHNIP and the group INGEROP did a 50\/50 partnership in a consortium called Gaiya to take care of the system project management of the CIGEO project. The system project management concerns the sketch missions, the brief and definitive preliminary draft of the following sub-systems :<\/div>\n<div class=\"extraits_de_la_fiche_technique_ding\u00e9rop_concernant_wiki\">&#8211; Nuclear process<\/div>\n<div class=\"extraits_de_la_fiche_technique_ding\u00e9rop_concernant_wiki\">&#8211; The surface nuclear facilities<\/div>\n<div class=\"extraits_de_la_fiche_technique_ding\u00e9rop_concernant_wiki\">&#8211; The surface conventional facilities<\/div>\n<div class=\"extraits_de_la_fiche_technique_ding\u00e9rop_concernant_wiki\">&#8211; The subterranean facilities and the surface-bottom link<\/div>\n<div class=\"extraits_de_la_fiche_technique_ding\u00e9rop_concernant_wiki\">&#8211; The common facilities<\/div>\n<\/blockquote>\n<p><\/p>\n<h3 id=\"extraits_de_ing\u00e9news_n_3_2013_wiki_280641\" class=\"extraits_de_ing\u00e9news_n_3_2013_wiki\"><a name=\"extraits-de-ing\u00e9news-n-3-2013\"><\/a>Translated extracts of <a href=\"http:\/\/www.ingerop.fr\/sites\/default\/files\/communiques_et_dossiers_presse\/ingenews3.pdf\">Ing\u00e9news n\u00b03 (2013) (french)<\/a><\/h3>\n<blockquote>\n<div id=\"extraits_de_ing\u00e9news_n_3_2013_wiki_280641\" class=\"extraits_de_ing\u00e9news_n_3_2013_wiki\">In January 2012, ANDRA gave to the group Gaiya, parity alliance between Technip and INGEROP, the project management of this iconic project. The mission given to Gaiya will take place in various steps during a period of time of almost 6 years\u00a0:<\/div>\n<div class=\"extraits_de_ing\u00e9news_n_3_2013_wiki\">&#8211; definition of the structural choices\u00a0;<\/div>\n<div class=\"extraits_de_ing\u00e9news_n_3_2013_wiki\">&#8211; selection of three global solutions of the pre-sketch level\u00a0;<\/div>\n<div class=\"extraits_de_ing\u00e9news_n_3_2013_wiki\">&#8211; sketch of a global solution\u00a0;<\/div>\n<div class=\"extraits_de_ing\u00e9news_n_3_2013_wiki\">&#8211; preparation of the file for the public debate\u00a0;<\/div>\n<div class=\"extraits_de_ing\u00e9news_n_3_2013_wiki\">&#8211; consulting the management of the subsystems which will take part in the preliminary drafts ;<\/div>\n<div class=\"extraits_de_ing\u00e9news_n_3_2013_wiki\">&#8211; definitive preliminary draft\u00a0;<\/div>\n<div class=\"extraits_de_ing\u00e9news_n_3_2013_wiki\">&#8211; project management of the design and implementation of the preparatory works;<\/div>\n<\/blockquote>\n<div id=\"extraits_du_rapport_annuel_2013_ding\u00e9rop_wiki_280641\" class=\"extraits_du_rapport_annuel_2013_ding\u00e9rop_wiki\">\n<\/p>\n<h3 class=\" shy_parent\"><a name=\"extraits-du-rapport-annuel-2013-ding\u00e9rop\"><\/a>Translated extracts of <a href=\"http:\/\/www.ingerop.fr\/sites\/default\/files\/communiques_et_dossiers_presse\/2013ingeroprapportannuel.pdf\">the annual report 2013 of INGEROP (french)<\/a><\/h3>\n<blockquote>\n<p lang=\"en-US\">CIGEO, industrial center of deep geological layers storage, precursor at a global level, is a unique project giving what is at stake, its time-line, its requirements, its extent and its cost, that require to create normative and reglementary referentials to apply. It mobilizes at a large scale the Ing\u00e9rop teams, as much in its territorial component as in its technical expertise.<\/p>\n<\/blockquote>\n<\/div>\n<div id=\"extraits_du_rapport_annuel_2014_ding\u00e9rop_wiki_280641\" class=\"extraits_du_rapport_annuel_2014_ding\u00e9rop_wiki\">\n<h3 class=\" shy_parent\"><a name=\"extraits-du-rapport-annuel-2014-ding\u00e9rop\"><\/a>Translated extracts of <a href=\"http:\/\/www.ingerop.fr\/sites\/default\/files\/communiques_et_dossiers_presse\/ra2014bd.pdf\">the annual report 2014 of INGEROP (french)<\/a><\/h3>\n<blockquote>\n<p lang=\"en-US\">Achievement of the year in urban engineering\u00a0: (\u2026) surface facilities linked with Cig\u00e9o.<\/p>\n<\/blockquote>\n<\/div>\n<div id=\"extraits_de_ing\u00e9rotech_n_5_2015_wiki_280641\" class=\"extraits_de_ing\u00e9rotech_n_5_2015_wiki\">\n<h3 class=\" shy_parent\"><a name=\"extraits-de-ing\u00e9rotech-n-5-2015\"><\/a>Translated extracts of <a href=\"http:\/\/www.ingerop.fr\/sites\/default\/files\/communiques_et_dossiers_presse\/ingerotech5web.pdf\">Ing\u00e9rotech n\u00b05 (2015) (french)<\/a><\/h3>\n<blockquote>\n<p lang=\"en-US\">The \u00ab System\u00a0\u00bb project management of the sketch phases, APS and APD has been given by the ANDRA to the Gaiya group (partnership 50\/50 between Technip and Ing\u00e9rop). The project will be structured in various sub-systems. The group Ing\u00e9rop is especially responsible for\u00a0: the surface nuclear facilities, the surface conventional facilities, the subterranean facility infrastructure, and the surface-bottom link, and a part of the common facilities.<\/p>\n<p lang=\"en-US\">The sketch phase, that took place in 2012-2013 allowed verifying the feasibility of the storage center, choosing the global design that will allow to ensure the follow-up of the timetable of implementation and to appreciate the cost of possession of CIGEO.<\/p>\n<p lang=\"en-US\">(\u2026)<\/p>\n<p lang=\"en-US\">For the geomecanic sizing of the subterranean work, our specialized subsidiary Geos developed a method that was published at the\u00a0tunnels world congress in Geneva in 2013.<\/p>\n<p lang=\"en-US\">(\u2026)<\/p>\n<p lang=\"en-US\">This sketch phase is being followed by two phases of preliminary draft (APS-APD) from late 2016 till mid-2017 allowing a refinement of the design.<\/p>\n<\/blockquote>\n<\/div>\n<div id=\"extraits_de_la_publication_de_2015_de_roberto_musc_wiki_280641\" class=\"extraits_de_la_publication_de_2015_de_roberto_musc_wiki\">\n<h3 class=\" shy_parent\"><a name=\"extraits-de-la-publication-de-2015-de-roberto-musc\"><\/a>Extracts of the <a href=\"http:\/\/www.davidpublisher.org\/index.php\/Home\/Article\/index?id=23681.html\">publication of 2015 of Roberto Muscetti &#8220;Managing the Cig\u00e9o design : A Challenge and an Opportunity&#8221; (english)<\/a><\/h3>\n<blockquote><p>The French engineering group <span class=\"caps\">INGEROP<\/span>, after being involved for years in the conceptual studies on the French deep geological repository\u2019s design for <span class=\"caps\">ANDRA<\/span>, is carrying out since 2012 the global project management and the technical integration for the CIG\u00c9O project.<br \/>\nIts activities have been carried out in the framework of a 50-50 consortium called \u201cGAIYA\u201d\u2014a name coming from the Greek goddess of earth and an African word for collective endeavor\u2014with the French company <span class=\"caps\">TECHNIP<\/span>, and concerned, at first, the engineering for the preliminary design, concluded in early 2013, and then the management and integration of the engineering studies for the basic design phase, which is still ongoing, followed by the detail design phase (to last until mid-2017).<\/p><\/blockquote>\n<\/div>\n<div id=\"extraits_du_rapport_annuel_2015_ding\u00e9rop_wiki_280641\" class=\"extraits_du_rapport_annuel_2015_ding\u00e9rop_wiki\">\n<h3 class=\" shy_parent\"><a name=\"extraits-du-rapport-annuel-2015-ding\u00e9rop\"><\/a>Translated extracts of <a href=\"http:\/\/www.ingerop.fr\/rapportannuel\/RAPPORT_ANNUEL_INGEROP_BD.pdf\">the annual report 2015 of INGEROP (french)<\/a><\/h3>\n<blockquote>\n<p lang=\"en-US\">2015 have been the year that ended the phase of brief preliminary draft of Cig\u00e9o.<\/p>\n<p lang=\"en-US\">(\u2026)<\/p>\n<p lang=\"en-US\">Therefore, there is around thirty specific jobs involved in its development to which contribute the expertise of almost all of the various activities of the group. Counting the project management of the sub-systems with which we finished the preliminary draft at the end of 2015, it is almost 400 people that work on CIGEO.<\/p>\n<\/blockquote>\n<\/div>\n<div id=\"extraits_du_rapport_annuel_2016_ding\u00e9rop_wiki_280641\" class=\"extraits_du_rapport_annuel_2016_ding\u00e9rop_wiki\">\n<h3 class=\" shy_parent\"><a name=\"extraits-du-rapport-annuel-2016-ding\u00e9rop\"><\/a>Translated extracts of <a href=\"http:\/\/www.ingerop.fr\/rapportannuel\/Rapport_Annuel_2016_Ingerop.pdf\">the annual report 2016 of INGEROP (french)<\/a><\/h3>\n<blockquote>\n<p lang=\"en-US\">Ing\u00e9rop was present at the WNE, essential rendez-vous of the subsidiaries of the nuclear energy branch, in Paris-Le Bourget from June 28th till June 30th. During this event, Ingerop hosted a conference on its stand\u00a0: \u00ab\u00a0Ing\u00e9rop\u2019s implication in the CIGEO project\u00a0\u00bb.<\/p>\n<p lang=\"en-US\">(\u2026)<\/p>\n<p lang=\"en-US\">Achievements of the year in Nuclear Energy\u00a0: (\u2026) significant operations continue\u00a0: Andra \u2013 Cig\u00e9o\u00a0: project management system of the disposal center of ultimate waste in Bure.<\/p>\n<\/blockquote>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>But what is INGEROP doing on the CIGEO project? In the beginning of 2012, Ing\u00e9rop becomes part of the Gaiya grouping which aims to carry out system project management for Cig\u00e9o, project of a disposal center for nuclear waste directed &hellip; <a href=\"https:\/\/lesmonstresdecigeo.noblogs.org\/en-US\/ingerop-et-cigeo\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":12815,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_locale":"en_US","_original_post":"133","footnotes":""},"class_list":["post-353","page","type-page","status-publish","hentry","en-US"],"_links":{"self":[{"href":"https:\/\/lesmonstresdecigeo.noblogs.org\/wp-json\/wp\/v2\/pages\/353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lesmonstresdecigeo.noblogs.org\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lesmonstresdecigeo.noblogs.org\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lesmonstresdecigeo.noblogs.org\/wp-json\/wp\/v2\/users\/12815"}],"replies":[{"embeddable":true,"href":"https:\/\/lesmonstresdecigeo.noblogs.org\/wp-json\/wp\/v2\/comments?post=353"}],"version-history":[{"count":10,"href":"https:\/\/lesmonstresdecigeo.noblogs.org\/wp-json\/wp\/v2\/pages\/353\/revisions"}],"predecessor-version":[{"id":402,"href":"https:\/\/lesmonstresdecigeo.noblogs.org\/wp-json\/wp\/v2\/pages\/353\/revisions\/402"}],"wp:attachment":[{"href":"https:\/\/lesmonstresdecigeo.noblogs.org\/wp-json\/wp\/v2\/media?parent=353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}